Menu Close
Fairview Heights streetscene

Inverness

Fairview Heights

£305,000 - £485,000

Fairview Heights, Inverness

Fairview Heights is a brand new development of 3 & 4 bedroom homes at the sought after location of Fairview Heights at Slackbuie in Inverness

This brand new phase is located in a fabulous setting close to local amenities and enjoying spectacular views over the city, towards the hills beyond the Highland capital.

Find out more today!

The Willow, 4 bedroom former showhome

Former Willow showhome video

View gallery

Homes on this development

Showing 16 homes.

Development plan

32 6no. 3-storey 2 Bed + Ens Flats Wi * Af * ASHP Ca * Af * ASHP Et Et Et Et * Lo ASHP Cu Lo * ASHP Tw ASHP Et Lo * ASHP Cu Tw * ASHP Tw ASHP Et * Ca Ca Cu * Cu * ASHP Ta * Et * Lo * ASHP Et Et Tw ASHP Tw ASHP El * Et El Ta ASHP Lo ASHP Af ASHP Et Lo * ASHP Af ASHP Lo ASHP ASHP Ta * 394 377 376 375 374 378 393 392 391 390 389 388 395 396 397 379 373 369 370 372 Et * 371 382 383 381 380 384 Tw * ASHP Ca * Co Co ASHP ASHP CoE * CoE Or * CoE * CoE Or * 398 399 400 401 402 403 404 405 ASHP Ta * To ASHP ASHP To Et * 310 311 312 313 314 309 386 385 387 Ca * Af ASHP 319 318 359 Ca * 358 356 357 355 354 353 352 351 Et * 316 320 321 322 315 6no. 3-storey 2 Bed + Ens Flats 6no. 3-storey 2 Bed + Ens Flats 331-336 337-342 343-348 Or Or 330 323 329 328 327 326 325 324 362 363 361 360 365 366 367 368 307 306 Co Co ASHP ASHP 350 349 303 302 301 364 Af ASHP Af ASHP Af ASHP Wi * To ASHP ASHP To 308 317 To ASHP ASHP To To ASHP ASHP To 2B4PV 2B4PV 3B5PV 3B5PV 4B6PV 3B5PV 3B5PV 304 T1625 T1 G1 G1 G2 G2 G2 G3 G3 No build limit Electricity service fenceline Culvert working area New electricity sub-station 6m development constraint from top of channel Existing spring 2m wide rural style path SuDS access off adoptable road Culvert under link road Ecology constraint RCP Plot 330 RCP Plots 323-329 2no. communal bin stores Tree Area G3 - mixed shelter belt with ash, birch, hazel and elder Tree Area G1 - linear woodland tree belt dominated by oak Tree Area G3 - mixed mature woodland, including oak, ash, sycamore and elm Gap in existing tree belt to accomodate overhead electricity service Existing post & wire fence along eastern edge of Tree Area G3 to be replaced 2m wide rural style path Open Space Open Space Open Space Shared driveway Shared driveway Car parking Existing gorse in this area to be removed Seating Area / Viewpoint Road junction traffic calming Raised table traffic calming SuDS Basin Existing tree - refer to Arboricultural Consultant information Stepped access path El * 305 Wildlife habitat corridor Wildlife habitat corridor under road - refer to Engineer's information Link road along frontage of site already covered by Planning Permission ref. no. 16/03053/FUL. Landscaping to western edge of road covered under link road and Phase G Planning Permissions. Flood Relief Channel 2m wide hard surfaced footpath 2m wide hard surfaced footpath 2m wide rural style path 2m wide rural style path First 5m of rural style path hard surfaced First 5m of rural style path hard surfaced 2m wide rural style path First 5m of rural style path hard surfaced Existing natural desire line retained Ref. Engineer dwg. for forward visibility requirements at road bends On street casual parking spaces Road junction traffic calming Car parking Car parking